Go back
Construction works in tunnel
GdaĆsk
0 tons
2014-04-01
DESCRIPTION
Design and construction of drilling ramps for drilling machines connecting two main lines with cross-cutting tunnels. During work ramps where relocated.
Term:
April 2014