DESCRIPTION
Installation of 13 pcs. of steel tanks in Machinery Hall of new-built Power Plant in Jaworzno (Poland). All works were conducted on three high deck-levels +9,5m, +17m, + 24m. Tanks were loaded onto each level via installation whole in the roof by a crawler crane. Then each of tanks was skidded and settled down onto its foundation with high precision by hydraulic jacks.