Jaworzno Poland
106 tons
2017-03-01
DESCRIPTION

Installation of 13 pcs. of steel tanks in Machinery Hall of new-built Power Plant in Jaworzno (Poland). All works were conducted on three high deck-levels +9,5m, +17m, + 24m. Tanks were loaded onto each level via installation whole in the roof by a crawler crane. Then each of tanks was skidded and settled down onto its foundation with high precision by hydraulic jacks.
TREND RESPONSIBILITIES/SCOPE OF WORK:

  • Design and prefabrication of dedicated bridge-beams for installing of 13 pcs. of steel tanks in Machinery Hall of new built Power Plant in Jaworzno on 3 floors
  • Loading steel tanks onto Machinery Hall via installation hole in the roof (by crawler crane) and then skidding through the hall to the demanded position
  • Settling of each tanks onto foundation with +/-1mm tolerance in all directions
13 pcs. of steel tanks

  • Q=21-106T
  • L=12-21m
  • B=fi 2 – 4,1m