Szczecin
760 tons
2012-12-01
DESCRIPTION

Loading, calculation of sea voyage, design of lashing, Two sister Ship Unloader Units, designed by Sandvik, built by Stalkon, each weighing 760t. Loading operation in Stettin, destination Eemshaven.
Term: October 2012
Scope of the project:
  • Transportation documentation: stability, acceleration calculations
  • - Weighing procedure for Units
  • - Assisting during load out
  • - Lashing documentation